One week to do the conversion. As usual, the hardest part was taking off the crank gear and the bottom bracket. This time I had to cut off the crank due to stripped screws, and I had to grind off the right side bottom bracket. Installation of the shift sensor required a new derailleur cable. Everything else went as expected.
top of page
bottom of page
Comments